Form cover
Page 1 of 2

STRUCTURAL INSPECTION APPLICATION

GENERAL INFORMATION

Applicant Name

Applicant Mobile Number

Applicant Email Address

Company Name

APPLICATION DETAILS

Application Type

Type of Structural Inspection

License Number

PROJECT INFORMATION

Plot Number/Unit Number

Zone

Permit Number

RAKEZ Stamped Drawing Reference Number

Consultant Name:

Building Name:

Contractor Name

Grid Lines

REQUIRED DOCUMENTS

Certificate of Field Density Test (FDT) from an attested lab in RAK (for foundation only)

Concrete cube tests results

Qibla direction certificate for mosques

100% Integrity test for all piles (For pile caps casting)

Copy of latest issued permit

Latest approved structural drawings

Specialist Approval Form (Steel Structures – PT Concrete – Precast Concrete)

Comment Compliance Report (for Re-inspection)

NOTES

RAKEZ reserves the right to request additional information (if necessary).

Consultant engineer must be at site at the time of inspection.

The below documents must be available at site at the time of inspection:

1. Scaffolding certificate from RAKEZ Registered third party consultants (For Slab casting). For obtaining the list of registered list Please click Here

2.  Field Density Test (FDT) stamped and approved by an attested laboratory in RAK for foundation inspection.

3. Cubes result along with confirmation letter stamped and signed by consultant.

DECLARATION
By checking the "I accept" box and submitting this form along with any attached documents, you confirm that all information provided is accurate and complete to the best of your knowledge. You understand that submitting false or misleading information may lead to application rejection and potential legal consequences. RAKEZ (Ras Al Khaimah Economic Zone) reserves the right to verify submitted information, share it with relevant authorities as required by law, and use it for processing your request. Submission of this form does not guarantee approval of your application. You consent to receive communication from RAKEZ regarding your application through the provided contact information.
We hereby undertake that the above inspection and the vertical elements are checked and found to be consistent with the zoning affairs approved drawings, specifications, building construction workmanship and industrial safety.
Untitled checkboxes field