The below documents must be available at site at the time of inspection:
1. Scaffolding certificate from RAKEZ Registered third party consultants (For Slab casting). For obtaining the list of registered list Please click Here
2. Field Density Test (FDT) stamped and approved by an attested laboratory in RAK for
foundation inspection.
3. Cubes result along with confirmation letter stamped and signed by consultant.
DECLARATION